# Capital Project Cost to Complete Excel Model

Know the final cost of a capital project before it is too late. The model builds the estimate at completion by work package, keeps pending changes apart and flags packages that will overrun.

- Canonical: https://finamodel.com/templates/capital-project-cost-to-complete-and-change-control
- Excel download: https://finamodel.com/templates/capital-project-cost-to-complete-and-change-control.xlsx
- Category: Operating Businesses
- Model type: Operating model
- Difficulty: Intermediate
- Audiences: CFOs & FP&A, Developers & sponsors, Founders & operators, Project cost controllers, Capital project managers, Funding approvers, Plant finance managers
- Tags: capital-projects, cost-to-complete, change-control, capex, project-controls

## Overview

A cost-to-complete and change control model for a capital project. It brings together actual costs, contracts, change orders and remaining estimates for each work package. The shipped case is a fictional packaging expansion at a components maker, with four work packages at 30 September 2026 in USD.

Authorized cost is the base contract plus approved changes. The estimate at completion adds actual costs, remaining contracted cost and an uncontracted estimate. Pending changes are shown as a separate risk, and rejected changes are left out. Each remaining estimate needs dated evidence, an owner and a reviewer, and its cash is spread over the next three months. A stress sheet adds an uplift to one package's remaining cost.

On the shipped case the authorized final cost is 3,480,000 USD and the estimate at completion is 3,295,000 USD. With 45,000 USD of pending changes the project is still 140,000 USD under budget. The electrical package, however, overruns its own authorization by 65,000 USD, so the decision is to escalate. A 10% stress on that package lifts its overrun to 96,000 USD.

## What's included

- Final cost bridge by work package
- Authorized cost from base contract plus approved changes
- Estimate at completion from actuals, remaining contract and uncontracted cost
- Change order log with status, committee reference and owner
- Pending changes kept apart from approved changes
- Posted actual cost ledger mapped to contracts
- Forecast support with estimate date, owner, reviewer and evidence
- Monthly cash profile of remaining cost
- Decision queue with risk-inclusive overrun by package
- Cost stress on a selected package with headroom
- Checks for unmapped invoices, unmapped changes and cash profile tie

## Final cost by package

Each work package shows actual cost, remaining contract and uncontracted estimate against its authorized cost.

## Changes under control

Approved changes raise authorization. Pending changes are shown as risk, and rejected changes are left out.

## Overruns found early

A package can overrun even when the project is under budget. The decision queue and stress test show where to act.

## Workbook structure

### Project review

Project cost summary and decision.

- Authorized final cost
- Estimate at completion
- Risk-inclusive over or under

### Decision queue

Package decisions and ownership.

- Base and risk EAC
- Pending changes
- Decision required

### Cash profile

Remaining cost by month.

- Remaining base by package
- Monthly cash spread
- Pending risk

### Cost build

Work package final cost bridge.

- Base contract and approved changes
- Actual and remaining cost

### Contracts

Contract and remaining cost inputs.

- Contract ID and supplier
- Remaining and uncontracted cost

### Changes

Change approval log.

- Amount and status
- Committee reference and owner

### Actuals

Posted actual cost ledger.

- Invoice and posting date
- Contract match

### Forecast support

Estimate evidence and cash timing.

- Estimate basis and owner
- Reviewer and approval date
- Monthly weights

### Cost stress

Stress test on one package.

- Base, pending and stressed EAC
- Headroom against authorization
- Package overrun

## Frequently asked questions

### What is cost to complete?

Cost to complete is the amount still needed to finish a project. Added to the cost spent so far, it gives the estimate at completion. Comparing that with the approved budget shows whether the project will finish under or over.

### How are change orders treated?

Approved changes are added to the authorized cost of their work package. Pending changes are shown as extra risk on top of the estimate. Rejected changes are left out of both.

### Why can a package overrun when the project is under budget?

Savings on some packages can hide an overrun on another. The decision queue tests each package against its own authorization. In the shipped case the electrical package overruns while the project as a whole stays under.

### What does the cost stress do?

It applies a percentage uplift to the remaining scope of one selected package. It shows the stressed package overrun and the project headroom. It is a review tool and does not change the base forecast.

### How do I use it for my own project?

Enter your work packages, contracts, change orders and posted invoices. Add forecast evidence and monthly weights for each package. Extend formulas, validations and controls together when adding rows.

## Related templates

- [Capex Planning](https://finamodel.com/templates/capex-planning)
- [Construction in Progress Capitalization Review](https://finamodel.com/templates/finawork-080-construction-in-progress-capitalization-review)
- [Construction Draw Schedule](https://finamodel.com/templates/construction-draw-model)