# Capital Rationing Project Selection Model

Choose the best mix of capital projects when money and people are limited. The model tests every combination against budget, staff and risk limits and picks the set with the highest NPV.

- Canonical: https://finamodel.com/templates/capital-project-portfolio-selection-optimizer
- Excel download: https://finamodel.com/templates/capital-project-portfolio-selection-optimizer.xlsx
- Category: Budgeting
- Model type: Operating model
- Difficulty: Advanced
- Audiences: CFOs & FP&A, Founders & operators, Capital planning and FP&A teams, CFOs setting capex budgets, Project portfolio and PMO leads, Operations leaders ranking investment requests
- Tags: capital-rationing, capital-budgeting, project-selection, npv, optimization, capex

## Overview

A capital rationing model that selects a portfolio of discrete projects. The starting case is a fictional manufacturer with eight candidate projects, such as an automation cell, plant expansion and warehouse robotics. Each has capex and cash inflows for three years plus engineering staff and risk points. Limits cover capex in each year, engineering staff and total risk.

The model lists all 256 combinations of the eight projects. Each one is tested against every limit, one mutually exclusive pair and one dependency, where a project needs its prerequisite. The feasible set with the highest NPV wins, with a clear tie rule. A review sheet compares the top three feasible sets and their headroom, and a grid reruns the search for different capital and risk caps.

In the case the best portfolio has an NPV of $26.45m, using four projects: automation cell, contract outsourcing, digital twin and fleet replacement. The runner-up is only $0.34m lower. At a risk cap of 14, raising first-year capital from $8m to $23m lifts optimal NPV from $10.84m to $26.45m.

## What's included

- Eight editable project slots with three years of capex and inflows
- NPV for each project at an editable discount rate
- Capital caps for each of three years
- Engineering staff cap and risk points cap
- One mutually exclusive pair and one dependency rule
- Full search of all 256 project combinations
- Highest-NPV feasible portfolio with a tie rule
- Top three feasible portfolios with headroom on each limit
- Capital and risk cap grid that reruns the search
- Chart of each candidate's NPV gap to the best portfolio
- Project owner and funding gate for selected projects

## The true best mix

Ranking projects by NPV alone can break a budget or skip a better combination. Testing every combination finds the real best set within all limits.

## Real-world rules

Some projects compete for the same need and some need another project first. The model enforces both, along with budget, staff and risk caps.

## See what a bigger budget buys

The cap grid shows how optimal NPV changes as capital or risk limits move. It helps make the case for, or against, more funding.

## Workbook structure

### Selection

Optimal project portfolio.

- Maximum NPV
- Selected projects
- Capex by year

### Candidate_Review

Top feasible alternatives.

- Top three portfolios and headroom
- Project NPV, owner and funding gate
- NPV gap chart

### Assumptions

Rate, limits and rules.

- Discount rate
- Capital, staff and risk caps
- Exclusive and dependent projects

### Projects

Project cash flows and resources.

- Capex by year
- Inflows by year
- Staff and risk points

### Enumeration

Search of all combinations.

- Project flags per subset
- Limit tests
- Feasible NPV ranking

### Input_Readiness

Input controls.

- Numeric inputs
- Budget and rate checks
- Unique project slots

## Frequently asked questions

### What is capital rationing?

Capital rationing is choosing which projects to fund when there is not enough money or resource for all of them. The goal is to pick the set that adds the most value within the limits. It is a common task in annual capex planning.

### How does the model find the best set?

With eight projects there are 256 possible combinations. The model tests every one against all limits and rules, then picks the feasible set with the highest NPV. This is exact, not an estimate.

### Why is a positive-NPV project sometimes left out?

A project can be good on its own but use too much capital, staff or risk budget. Leaving it out may allow a better combination of other projects. Rejection does not mean the project is bad.

### What are the limits?

The model holds eight project slots and one exclusive pair and one dependency. A ninth project needs the search extended. All projects and figures are fictional.

### Can I enter my own projects?

Yes. Replace the projects in the eight slots on Projects and set the discount rate, caps and rules on Assumptions. A zero cap is valid.

## Related templates

- [Capex Planning](https://finamodel.com/templates/capex-planning)
- [Real Options Investment Appraisal Model](https://finamodel.com/templates/finawork-005-real-options-investment-appraisal)
- [Capital Project Cost to Complete and Change Control](https://finamodel.com/templates/finawork-083-capital-project-cost-to-complete-and-change-control)