# Tender Bid Pricing and Approval Analysis

Price a binding tender offer on a full cost base and release it only with the right approvals. The workbook builds cost and risk, tests margins and concessions and checks every sign-off.

- Canonical: https://finamodel.com/templates/commercial-tender-bid-pricing-approval-workbook
- Excel download: https://finamodel.com/templates/commercial-tender-bid-pricing-approval-workbook.xlsx
- Category: Operating Businesses
- Model type: Operating model
- Difficulty: Intermediate
- Audiences: Founders & operators, CFOs & FP&A, Bid and tender managers, Commercial directors, Estimators and cost engineers, Commercial finance analysts
- Tags: bid-pricing, tender, margin-analysis, risk-allowance, commercial-approval

## Overview

A tender bid pricing and approval workbook for commercial and finance teams preparing a binding offer. The shipped case is a fictional automation contractor bidding on an industrial controls installation for a utility.

Eight work packages give direct cost from quantity, unit cost and vendor allowances. Overhead applies to direct cost only. Four risk allowances equal residual probability times event loss plus mitigation spend. Three priced contract deviations and a bond premium complete the bid cost. Target price is cost divided by one minus the target margin, and gross margin and markup are kept distinct.

On the shipped case total bid cost is $392,364.80 and the proposed offer is $525,000, giving a gross margin of 25.3% against a 24% target and an 18% floor. All deviations and sign-offs match the current version, so the offer is approved for release. A stress grid tests overruns and concessions, and a negotiation sheet shows headroom if named risks occur.

## What's included

- Line-item cost build by work package with vendor allowances
- Corporate overhead on direct cost only
- Risk allowances from residual probability, event loss and mitigation
- Priced contract deviations with owner and approval
- Bond premium in total bid cost
- Target price, minimum floor price and proposed offer
- Gross margin and markup shown separately
- Version-controlled sign-offs that go stale when price or cost changes
- Margin exception approval for below-target offers
- Cost overrun and price concession stress grid
- Concession limits by named risk event
- Approved and live risk basis comparison

## Price from full cost

Direct work, overhead, risk, deviations and bond are each counted once, so the price covers the real cost of the job.

## Release with control

An offer is released only when every deviation and sign-off matches the current version, price and cost.

## Know your negotiation room

Stress tests and risk events show how far you can concede before the margin floor is breached.

## Workbook structure

### Approval

Release decision and pricing alternatives.

- Cost, offer and margin
- Open items
- Floor, target and proposed price

### Controls

Tender commercial controls.

- Bid version and dates
- Target and minimum margin
- Proposed bid

### Pricing

Binding offer price build.

- Cost components
- Target price, margin and markup

### Costs

Line-item cost build.

- Quantity and unit cost
- Vendor allowance and direct cost

### Risks

Bid risk allowance.

- Probability and loss
- Mitigation and owner

### Deviations

Deviation approval log.

- Standard and offered terms
- Cost allowance and decision

### Signoffs

Required offer sign-offs.

- Role, approver and date
- Approved version and price

### Commercial review

Risk and cost decisions.

- Ranked risk allowances
- Deviation actions
- Cost bridge

### Stress

Overrun and concession grid.

- Stressed cost and offer
- Margin and floor price

### Negotiation

Concession limits by risk event.

- Conditional cases
- Floor headroom chart

### Risk approval basis

Approved against live risk assumptions.

- Probability and loss changes
- Approval record by version

### Checks

Tender price reconciliations.

- Cost and price ties
- Event case reconciliation

## Frequently asked questions

### What is tender bid pricing?

Tender bid pricing sets the price you offer in a formal bid. It starts from the full cost of the scope, adds allowances for risk and contract terms, and applies a margin. Approval checks confirm the offer before it becomes binding.

### What is the difference between margin and markup?

Gross margin is profit divided by price. Markup is profit divided by cost. The workbook shows both because they give different percentages for the same profit.

### How are risk allowances calculated?

Each risk has a residual probability, a loss if the event happens and a mitigation spend. The allowance is probability times loss plus the mitigation spend. A risk cost is never also counted as a direct line cost.

### Is this an e-signature system?

No. It is an approval workpaper. Sign-off records capture the approved version, price and cost, and any change makes them stale until resubmitted. It makes no claim that contract terms are legally adequate.

### How do I use it for my own tender?

Update the controls, cost lines, risks and deviations, then collect fresh sign-offs for the current version. Extend the ranges together for a larger tender.

## Related templates

- [Service Charge-Out Rate Build-Up](https://finamodel.com/templates/finawork-111-service-charge-out-rate-build-up)
- [Job Costing and Contract Profitability Ledger](https://finamodel.com/templates/finawork-088-job-costing-and-contract-profitability-ledger)
- [Special Order Incremental Profit Appraisal](https://finamodel.com/templates/finawork-105-special-order-incremental-profit-appraisal)