# Construction in Progress Capitalization Tracker

Close construction in progress with confidence. Review each project cost, reclass items that cannot be capitalized and transfer projects to fixed assets once they are ready for use.

- Canonical: https://finamodel.com/templates/construction-in-progress-capitalization-review
- Excel download: https://finamodel.com/templates/construction-in-progress-capitalization-review.xlsx
- Category: Accounting & Audit
- Model type: Operating model
- Difficulty: Intermediate
- Audiences: CFOs & FP&A, Developers & sponsors, Project accountants, Fixed asset accountants, Financial controllers, External auditors
- Tags: construction-in-progress, capitalization, fixed-assets, capex, month-end-close

## Overview

A close review for construction in progress (CIP). It takes actual project cost lines, tests each for eligibility and moves completed projects into depreciable assets. The shipped case is a fictional manufacturer with three projects, a machining cell, a warehouse extension and an inspection station, for the year to 30 September 2026 in USD.

Each cost line records its nature, posting date, amount, eligibility, basis and evidence. Items such as staff training after commissioning or idle site costs are reclassed to expense. A project can transfer only once it has an approved ready-for-use date. Posted transfer journals are recorded with the asset, date, reference and equal debit and credit amounts, and only a verified posting reduces CIP.

On the shipped case 19,500 USD is reclassed to expense and 630,500 USD of CIP is available. Two ready projects transfer 329,500 USD, and the posted journals match the proposals with no gap to the ledger. The warehouse extension keeps 301,000 USD of eligible CIP with a not-ready status, because its ready date falls after the period end.

## What's included

- Project cost lines with nature, amount, eligibility and evidence
- Expense reclass for costs that cannot be capitalized
- Opening CIP, eligible additions and available CIP by project
- Ready-for-use date, approval and reviewer by project
- Transfer proposal with asset ID, class and useful life
- Posted journal evidence with debit and credit check
- Closing CIP and GL gap from posted amounts
- Proposal less posted amount shown separately
- Close backlog with owner, days open and workflow status
- Checks for unmapped and incomplete costs

## Only eligible costs capitalized

Each cost line is tested for eligibility. Costs like training or idle time are moved to expense with the reason shown.

## Transfer when ready for use

A project moves to fixed assets only after an approved ready-for-use date. Projects not yet ready keep their CIP balance.

## Proposals checked against postings

Posted transfer journals must match the project, asset and amount. Any gap to the ledger is shown.

## Workbook structure

### Capitalization

CIP review by project.

- Opening, posted and reclassed costs
- Available CIP and ready date
- Cost review checks

### Cost lines

Actual project cost lines.

- Cost nature and amount
- Eligibility, basis and evidence

### Projects

Readiness and approvals.

- Ready-for-use date and evidence
- Approval, asset ID and reviewer

### Transfer journal

Transfer proposals and posting evidence.

- Asset class and useful life
- Journal and posting date

### Transfer backlog

Capitalization close backlog.

- Eligible and posted transfers
- Proposal less posted
- Workflow status

## Frequently asked questions

### What is construction in progress?

Construction in progress is the cost of assets that are being built or installed but are not yet ready for use. These costs sit on the balance sheet without depreciation. When the asset is ready, the balance moves to fixed assets and depreciation starts.

### Which costs can be capitalized?

The workbook uses your eligibility decision for each cost line, with a basis and evidence. In the shipped case equipment, installation, testing and permits are capitalized. Training after commissioning and abnormal idle site costs are reclassed to expense.

### Why is a project not transferred?

A project transfers only once it has an approved ready-for-use date on or before the cutoff. If not, it keeps its eligible CIP balance with a not-ready status. It does not show as ineligible.

### Does it calculate depreciation?

No. It records the asset class and useful life on the transfer proposal. Depreciation is worked out in your fixed asset register after the transfer.

### How do I use it for my own projects?

Enter your cost lines, projects and readiness evidence, and set the period dates. Record each posted transfer journal with its reference and amounts. Extend formulas, validations and controls together when adding rows.

## Related templates

- [Capex Planning](https://finamodel.com/templates/capex-planning)
- [Depreciation](https://finamodel.com/templates/depreciation)
- [Capital Project Cost to Complete and Change Control](https://finamodel.com/templates/finawork-083-capital-project-cost-to-complete-and-change-control)