# Green Financing Use of Proceeds Tracker

Track how green financing proceeds are allocated to eligible, paid projects. See what is allocated, what is left and which claims are rejected, then tie the balance to treasury.

- Canonical: https://finamodel.com/templates/green-financing-use-of-proceeds-allocation-register
- Excel download: https://finamodel.com/templates/green-financing-use-of-proceeds-allocation-register.xlsx
- Category: Sustainability
- Model type: Operating model
- Difficulty: Intermediate
- Audiences: CFOs & FP&A, Credit & risk, Treasury controllers, Sustainability finance managers, Financial reporting teams, Internal auditors
- Tags: green-bonds, use-of-proceeds, sustainable-finance, treasury, allocation-reporting

## Overview

A use of proceeds register for treasury and sustainability finance controllers. The shipped case is a fictional manufacturer with two green financings and six spend items across renewable power, energy and water efficiency and one excluded transport project. The framework is fictional and is not a claim of regulatory alignment.

Net proceeds exclude issuance fees. Eligible paid cost excludes funding claimed elsewhere, and eligibility is a documented controller approval. Claims apply in row priority order. A claim that exceeds the remaining proceeds or spend is rejected in full, and duplicate IDs block eligibility. Allocation dates must follow receipt and payment dates. A separate options sheet sizes new proposals against what is left in each pool.

On the shipped case USD 9.93 million is raised net, USD 5.2 million is allocated and USD 4.73 million is unallocated. USD 2.6 million of claims are rejected for overclaims and an ineligible project. Unallocated balances tie to the treasury ledger with a zero gap, and category totals reconcile to the allocated amount.

## What's included

- Financing register with gross receipt, fees and net verified pool
- Expenditure register with paid cost, other funding, category and eligibility approval
- Allocation claims applied in row priority order
- Full rejection of claims that exceed remaining proceeds or eligible spend
- Duplicate spend, invoice evidence and claim ID checks
- Date checks against receipt, paid and as-of dates
- Allocated and unallocated balance by financing
- Treasury ledger tie with gap check
- Allocation by category and split of new expenditure and refinancing
- Proposal tool that sizes new allocations against pool and spend left
- Chart of allocation status by verified pool

## Only eligible, paid spend

Claims count only against approved spend that is paid and not funded elsewhere. Ineligible projects and missing payment evidence get separate next actions.

## No double counting

Claims apply in priority order and cannot reuse proceeds or spend already allocated. Overclaims are rejected in full, not cut down.

## Ties to treasury

The unallocated balance for each financing is compared with an independent treasury ledger, so any gap shows at once.

## Workbook structure

### Summary

Raised, allocated and unallocated by financing.

- Treasury ledger gap
- Allocation by category
- Rejected claims and action owner

### Allocation options

Sizes new proposals against what is left.

- Pool and spend left before each proposal
- Feasible and unfunded amounts
- Pool status chart

### Allocations

Actual claims in priority order.

- Requested amount and date
- Approver and evidence
- Proceeds cap

### Financing

Cash actually received.

- Gross, fees and net
- Bank receipt and verified pool

### Expenditure

Paid cost net of other funding.

- Project and category
- Eligibility and approver
- Remaining eligible spend

## Frequently asked questions

### What is a use of proceeds register?

It records how money raised through a green financing is spent. Each allocation links an amount of proceeds to an eligible project, with dates, approvals and evidence. It shows how much is allocated and how much is still to be used.

### Why are claims rejected in full?

The register does not accept part of a claim. If a request is larger than the proceeds or eligible spend left, the whole claim is rejected so it can be corrected and approved again.

### Does the order of claims matter?

Yes. Claims apply in the row order shown, which is the funding priority. Do not sort the rows, or the remaining capacity for later claims will change.

### What is not included?

The framework in the case is fictional and is not a claim of alignment with any green bond standard. The proposal tool covers new spend only; refinancing requests need a separate review.

### How do I use it for my own financing?

Replace the financing, expenditure and allocation records with your own, with approvals and evidence. Keep the formulas and extend the formula and validation ranges when you add rows.

## Related templates

- [Sustainability-Linked Loan Margin Ratchet Calculation](https://finamodel.com/templates/finawork-471-sustainability-linked-loan-margin-ratchet-calculation)
- [Sustainability Disclosure Financial Connectivity Reconciliation](https://finamodel.com/templates/finawork-479-sustainability-disclosure-financial-connectivity-reconciliation)
- [Debt Schedule](https://finamodel.com/templates/debt-schedule)