# Real Options Investment Appraisal Excel Model

Put a value on management flexibility. The model rolls back a binomial decision tree to price the choice to invest now, wait, expand or abandon, and checks each step against approval limits.

- Canonical: https://finamodel.com/templates/real-options-investment-appraisal
- Excel download: https://finamodel.com/templates/real-options-investment-appraisal.xlsx
- Category: Valuation
- Model type: Valuation
- Difficulty: Advanced
- Audiences: CFOs & FP&A, Investors & analysts, Developers & sponsors, Corporate development and capital planning teams, Investment committee members, Project sponsors weighing staged investments, Finance students learning real options
- Tags: real-options, decision-tree, binomial, capital-budgeting, npv, valuation

## Overview

A real options model that values flexibility in a staged investment. The starting case is a fictional storage project with an asset value of $100m and an initial investment of $95m. Four cases sit on one selector: Base, Fee, Tight cap and High fee, which change the licence cost and approval limits.

Project value moves up or down on a two-step recombining tree with risk-neutral probabilities. At year two an active project can operate, expand or abandon for salvage, and a project not yet started can invest at escalated capex. Backward induction then picks invest, wait or walk away at year one and today. A stage register sets a separate approval limit for each decision.

In the Base case the fixed commitment NPV is $5m, investing now with flexibility is worth $24.59m and waiting is worth $40.40m, so the model recommends waiting. The maximum viable licence is about $15.81m. A check sheet tests the martingale identity, asset present value, the policy value bridge and that a blocked action stays blocked.

## What's included

- Two-step recombining binomial tree under risk-neutral probabilities
- Choices to invest now, wait, expand, abandon or walk away
- Fixed commitment NPV against option value with flexibility
- Four cases on one selector: Base, Fee, Tight cap and High fee
- Switches to turn deferral, expansion and abandonment on or off
- Stage register with decision dates, approval body, limit and headroom
- Next action by realised up or down state
- Expansion trigger, abandonment threshold and maximum viable licence
- Check sheet for martingale identity, value bridge and blocked actions

## Value the right to wait

A fixed NPV assumes you commit today. The tree shows what it is worth to delay, expand later or walk away, so you can see the value that a plain NPV leaves out.

## Respect approval limits

Each stage has its own spending limit. If an action breaks a limit it is blocked, and the model picks the best action that is still allowed.

## Clear next steps

The summary shows the action for today and the action for each year-one state. Teams know what to do if demand turns out high or low.

## Workbook structure

### Summary

Today's actions, recommended policy and thresholds.

- Policy value and cost of each action
- Fixed NPV against option value
- Next action by state
- Licence threshold

### Assumptions

Case selector and editable project inputs.

- Asset value, investment and risk-free rate
- Up and down multipliers
- Expansion, abandonment and option switches

### Stage mandate

Approval register for each stage.

- Decision date and gross cash
- Approval body and limit
- Availability and headroom

### Decision tree

Rollback of the staged policy.

- Terminal operate, expand or abandon values
- Year-one invest or wait choice
- Funded policy path

### Check

Diagnostics that must hold.

- Martingale identity
- Policy value bridge
- Probability bounds and blocked actions

## Frequently asked questions

### What is a real option?

A real option is a right, but not a duty, to take a business action later, such as to delay, expand or abandon a project. These rights have value because you can act after you learn more. A standard NPV does not capture that value.

### How does the decision tree work?

Project value moves up or down each year. At the end, each path picks its best action. The model then works back to today, discounting at the risk-free rate with risk-neutral probabilities, and picks the best action at each step.

### Why does the model recommend waiting?

In the Base case waiting is worth more than investing now because the down state can be avoided. The fixed NPV is positive, but the option to delay adds more value than it costs.

### What are the limits?

The tree has two steps and uses a simplified risk-neutral framework. The up and down moves describe scenarios, not forecast probabilities. All values are fictional.

### Can I change the project or limits?

Yes. Edit the project value, investment, multipliers, expansion and salvage inputs on the Assumptions sheet. Change the case to test tighter limits or higher fees.

## Related templates

- [Capex Planning](https://finamodel.com/templates/capex-planning)
- [Option Pricing](https://finamodel.com/templates/option-pricing)
- [Capital Project Portfolio Optimizer](https://finamodel.com/templates/finawork-029-capital-project-portfolio-selection-optimizer)