# Supplier Quotation Comparison Analysis

Compare supplier and finance quotes on a fair basis before you award. The workbook converts each offer to a present cost, scores quality, terms and timing, and recommends the best valid offer.

- Canonical: https://finamodel.com/templates/supplier-and-finance-service-quotation-comparison
- Excel download: https://finamodel.com/templates/supplier-and-finance-service-quotation-comparison.xlsx
- Category: Operating Businesses
- Model type: Operating model
- Difficulty: Intermediate
- Audiences: CFOs & FP&A, Founders & operators, Procurement managers and buyers, Treasurers comparing bank offers, Finance managers approving supplier awards, Risk and insurance managers
- Tags: procurement, quote-comparison, supplier-selection, vendor-evaluation, treasury

## Overview

A quotation comparison for procurement and treasury decisions. It compares competing offers for goods, services, loans, deposits and insurance in one workflow. The shipped case is a fictional group with several quotes for each offer type.

Each quote's cash flows are dated and discounted, so offers with different payment days, upfront fees and scope top-ups compare on present net cost. Cost is then scored against the valid offers, and quality, terms and timing are scored on a set rubric. Weights differ by offer type. Offers that fail a mandatory test cannot win.

On the shipped case one offer is recommended for each type, such as a goods quote at $48,197 present cost with a score of 94. The award sheet shows the runner-up, the score advantage and the present value premium. A sensitivity sheet tests price, payment days, fees and stress weights, and checks confirm the weights add to one.

## What's included

- Quote register for goods, services, lending, deposit and insurance offers
- Dated cash timing with discounting to present net cost
- Scope equalization so offers compare on the same scope
- Cost score set by the range of valid priced offers
- Quality, terms and timing scores on a 0 to 100 rubric
- Weights and discount rate by offer type
- Mandatory failures kept out of the recommendation
- Award decision with runner-up, score advantage and PV premium
- Base and stress sensitivity of scores and present cost
- Approval record by owner and weight checks

## Compare on present cost

Payment days, upfront fees and scope gaps are turned into one present net cost, so a later payment or a lower fee counts fairly.

## Score more than price

Quality, terms and timing are scored on a clear rubric and weighted by offer type. A failed mandatory test removes the offer.

## Test the award

Change prices, payment days, fees or weights and see whether the same offer still wins and what premium it costs.

## Workbook structure

### Review

Recommendation by offer type.

- Recommended quote and counterparty
- Present net cost and score
- Approvals and weight checks

### Comparison

Normalized offer comparison.

- Nominal and present net cost
- Cost, quality and terms scores

### Cash timing

Dated cash normalization.

- Cash events by day
- Discount factor and PV cost

### Criteria

Weights and score rubric.

- Discount rate and weights by type
- Scope definition
- Score rubric

### Quotes

Received quotations.

- Units or principal and price or rate
- Upfront fee and scope top-up
- Payment day

### Award decision

Winner, runner-up and approval.

- Score advantage
- PV premium
- Approver

### Offer economics

How to read the results.

- Cost convention and horizon
- Weights and tie handling

### Offer sensitivity

Base and stress test.

- Base and stress scores and PV
- Stress weight override
- Award test

## Frequently asked questions

### What is a quotation comparison?

It is a structured way to compare competing offers before you award a contract. Instead of picking the lowest price, you compare cost on the same basis and score other factors such as quality, terms and timing.

### Why use present cost instead of the quoted price?

Offers pay at different times and carry different fees and scope. Discounting each dated cash flow gives a present net cost, so a quote with later payment or a lower fee is valued fairly.

### How are finance offers compared?

Loans, deposits and insurance use the same workflow. For a loan the draw is a receipt and repayment a cost. For a deposit the interest received lowers the cost. Insurance quotes compare on the same limit and deductible.

### Can an offer with a failed requirement win?

No. Mandatory failures stay outside the recommendation, even if their price is lowest. An award approval cannot override a mandatory exclusion.

### How do I change the weights?

Edit the cost, quality, terms and timing weights by offer type on Criteria. They must be zero or more and add to one. On Offer sensitivity you can override all four stress weights together.

## Related templates

- [Business Insurance Policy and Renewal Register](https://finamodel.com/templates/finawork-141-business-insurance-policy-and-renewal-register)
- [Bank Loan Analysis Model](https://finamodel.com/templates/bank-loan-model)
- [Three-Way Invoice Matching Workpaper](https://finamodel.com/templates/finawork-051-three-way-invoice-matching-workpaper)
