# Supplier Should-Cost Negotiation Excel Model

Know what a supplier's part should cost before you negotiate. The model rebuilds unit cost from the ground up, sets target and walkaway prices and compares payment offers on equal terms.

- Canonical: https://finamodel.com/templates/supplier-should-cost-negotiation-model
- Excel download: https://finamodel.com/templates/supplier-should-cost-negotiation-model.xlsx
- Category: Operating Businesses
- Model type: Operating model
- Difficulty: Advanced
- Audiences: Founders & operators, CFOs & FP&A, Procurement and category managers, Cost engineers, Supply chain finance analysts, Sourcing directors
- Tags: should-cost, procurement, supplier-negotiation, cost-modeling, manufacturing

## Overview

A should-cost negotiation model for procurement and category teams. It rebuilds what a supplier's products should cost and uses that to set a fair price. The shipped case is a fictional buyer negotiating three valve actuator SKUs with one supplier.

Material cost comes from net quantities, yields and quoted prices. Labor, machine minutes and energy come from routing data, and fixed machine cost is allocated per minute at a normal load. Tooling and admin are added to reach production cost. Target and ceiling margins give a target price and a walkaway ceiling for each SKU. Two payment offers are compared on delivered cost and buyer present value.

On the shipped case the supplier quote is $3,530,440 a year against a target landed spend of $2,820,637, a gap of $709,803 or 20%. One counteroffer is above its ceiling. Offer B, with a 1% discount for paying in 15 days, beats Offer A by $25,083 in present value. Checks confirm capacity, allocation and margin rebuilds.

## What's included

- Material cost rebuild from net quantity, yield and price
- Labor, machine and energy cost from routing minutes
- Supplier practical capacity, load and fixed cost per minute
- Tooling and administration recovery per unit
- Reconstructed production cost by SKU
- Target ask price and walkaway ceiling from target and ceiling margins
- Counteroffer review against the ceiling with owner and approval
- Ranked negotiation levers for materials, wages and payment days
- Payment package comparison on delivered invoice and buyer present value
- Buyer funding rate at which both offers are equal
- Volume case with fixed cost absorption
- Cost evidence register with confidence and limits

## Cost from the ground up

Materials, labor, energy, machine time and tooling are rebuilt per unit, so you can test the supplier quote line by line.

## Clear price targets

Each SKU gets a target ask and a walkaway ceiling, and each counteroffer is checked against them.

## Fair offer comparison

Payment offers are compared on the same SKUs, volumes and delivery date, using delivered cost and present value.

## Workbook structure

### Summary

Negotiation economics and offer choice.

- Quote, target and savings
- Capacity load
- Payment package choice

### Payment packages

Offers on equal delivery terms.

- Net factory, freight and duty
- Buyer present value
- Minimum supplier margin

### Negotiation

Evidence and term trade-offs.

- Target ask and walkaway ceiling
- Counteroffer feasibility
- Fixed cost absorption

### Negotiation levers

Single-driver cost levers.

- Cost impact and rank
- Ask, owner and evidence

### Inputs

Negotiation assumptions.

- Case selector and volume factors
- Target and ceiling margins
- Wages, energy and payment terms

### SKUInputs

Supplier quote and buyer demand.

- Annual units
- Quote and counteroffer

### Materials

Material cost rebuild.

- Net and gross quantity
- Yield and unit price

### Routing

Labor and machine routing.

- Labor and machine minutes
- Energy per unit

### Capacity

Practical capacity and allocation.

- Fixed cost per minute
- Load and spare minutes

### UnitCost

Reconstructed unit economics.

- Cost elements by SKU
- Production cost

### Terms

Commercial terms and ranges.

- Target, quoted and counteroffer price
- Target landed cost

### Checks

Reconciliation checks.

- Savings and allocation ties
- Capacity feasibility

### Cost evidence

Evidence and confidence.

- Input scope and owner
- Confidence and limitation

## Frequently asked questions

### What is a should-cost model?

A should-cost model estimates what a product ought to cost to make, based on its materials, labor, machine time and overheads plus a fair margin. Buyers use it to test a supplier quote and to set a fact-based negotiation target.

### How is the target price set?

The model rebuilds production cost per unit and adds a target gross margin to get the target ask. A higher ceiling margin gives the walkaway price. Counteroffers above the ceiling are flagged.

### How are payment offers compared?

Both offers price the same SKUs and volumes with freight and duty. Invoices are discounted to a common delivery date at the buyer's funding rate. The model also shows the funding rate at which both offers are equal.

### What are the limits?

Cost inputs are estimates with stated confidence, not a site audit. Duty is illustrative. The minimum supplier margin and practical capacity must hold for an offer to be feasible.

### How do I use it with my own supplier?

Enter your SKUs, volumes and quotes, then the bill of materials, routing, wage, energy and capacity data. Set target and ceiling margins and payment terms on Inputs.

## Related templates

- [Supplier and Finance Service Quotation Comparison](https://finamodel.com/templates/finawork-050-supplier-and-finance-service-quotation-comparison)
- [Landed Purchase Cost Allocation](https://finamodel.com/templates/finawork-086-landed-purchase-cost-allocation)
- [Make-or-Buy and Outsourcing Appraisal](https://finamodel.com/templates/finawork-104-make-or-buy-and-outsourcing-appraisal)
