Construction in Progress Capitalization Tracker
Accounting & Audit Financial Model (Excel Download)
Close construction in progress with confidence. Review each project cost, reclass items that cannot be capitalized and transfer projects to fixed assets once they are ready for use.
professionals from Deloitte
About this model
A close review for construction in progress (CIP). It takes actual project cost lines, tests each for eligibility and moves completed projects into depreciable assets. The shipped case is a fictional manufacturer with three projects, a machining cell, a warehouse extension and an inspection station, for the year to 30 September 2026 in USD.
Each cost line records its nature, posting date, amount, eligibility, basis and evidence. Items such as staff training after commissioning or idle site costs are reclassed to expense. A project can transfer only once it has an approved ready-for-use date. Posted transfer journals are recorded with the asset, date, reference and equal debit and credit amounts, and only a verified posting reduces CIP.
On the shipped case 19,500 USD is reclassed to expense and 630,500 USD of CIP is available. Two ready projects transfer 329,500 USD, and the posted journals match the proposals with no gap to the ledger. The warehouse extension keeps 301,000 USD of eligible CIP with a not-ready status, because its ready date falls after the period end.
What every model includes
Live formulas, no hardcoded values
Outputs are driven by live formulas, so the workbook updates from its assumptions instead of relying on hardcoded results.
All assumptions in one tab
Inputs are clearly marked in the Assumptions tab and separated from calculations, making it clear what to change and what to leave intact.
Statements always balancing
For integrated-statement models, the balance sheet, cash flow, and supporting schedules tie through properly.
Distinct schedules for clarity
Debt, working capital, taxes, and cash flow can get messy quickly. We group calculations in clear schedules, not across disconnected tabs.
No hidden macros or external links
There are no unexplained external workbook links or macros to undermine auditability or portability.
Changes flow through the model
Update a key driver and see the impact carry through the forecast, financing, and return outputs. We never use hardcoded numbers in formulas.
What's inside the Construction in Progress Capitalization Tracker
- Project cost lines with nature, amount, eligibility and evidence
- Expense reclass for costs that cannot be capitalized
- Opening CIP, eligible additions and available CIP by project
- Ready-for-use date, approval and reviewer by project
- Transfer proposal with asset ID, class and useful life
- Posted journal evidence with debit and credit check
- Closing CIP and GL gap from posted amounts
- Proposal less posted amount shown separately



Formatted to IB standards
Named theme colors repaint the whole workbook in one click, on top of an investment-banking structure with clear input, output, and cross-sheet reference styling - brand-ready, institutional-grade, and fully auditable.
Created by ex-finance professionals
Hey, I’m Alex and I created Finamodel.
Over my years in the finance industry I kept building the same models over and over again. Same structure, same assumptions, different logo. So I started building frameworks to turn them into clean, reusable templates.
Every model here is one I’d actually use for a client, and I personally vet each one before it goes up.
I’m not an expert in every industry, but I’ve built enough models to know what belongs in one. And when something is completely foreign to me, I reach out to my network for experts to work on our models with us.
Having a template library on hand cuts a first build from hours to minutes.
Frequently asked
What is construction in progress?+
Construction in progress is the cost of assets that are being built or installed but are not yet ready for use. These costs sit on the balance sheet without depreciation. When the asset is ready, the balance moves to fixed assets and depreciation starts.
Which costs can be capitalized?+
The workbook uses your eligibility decision for each cost line, with a basis and evidence. In the shipped case equipment, installation, testing and permits are capitalized. Training after commissioning and abnormal idle site costs are reclassed to expense.
Why is a project not transferred?+
A project transfers only once it has an approved ready-for-use date on or before the cutoff. If not, it keeps its eligible CIP balance with a not-ready status. It does not show as ineligible.
Does it calculate depreciation?+
No. It records the asset class and useful life on the transfer proposal. Depreciation is worked out in your fixed asset register after the transfer.
How do I use it for my own projects?+
Enter your cost lines, projects and readiness evidence, and set the period dates. Record each posted transfer journal with its reference and amounts. Extend formulas, validations and controls together when adding rows.
Have more financial modelling questions? Contact us
Related templates
Capex Planning
12-month capex portfolio plan with NPV economics, budget envelope tracking, and traffic-light approval status.
Depreciation
12-month fixed-asset register with capex schedule and straight-line depreciation across an asset panel.
Capital Project Cost to Complete and Change Control
Forecast final cost by work package from actuals, contracts and changes, and compare it with the authorized budget.
Beneish M-Score Earnings Manipulation Diagnostic
Calculate the Beneish M-Score from three years of financials, see which ratios drive it and track follow-up questions.