Commodity Provisional Pricing Settlement Calculator
Operating Businesses Financial Model (Excel Download)
Turn a provisional commodity invoice into a final settlement you can check line by line. The calculator averages the pricing window, applies assays and charges, and shows the final cash due.
professionals from Deloitte
About this model
A final settlement calculator for provisionally priced physical commodity deliveries. It applies contract pricing windows, quality adjustments and settlement terms to the quantities delivered. The shipped case is a fictional copper concentrate sale with two lots.
The final price is the average of five final fixings inside each inclusive pricing window. Wet tonnes less moisture give dry tonnes. Payable copper deducts one assay point, then applies 96.5% payability. Treatment, refining and freight charges and an arsenic penalty follow the contract bases. The final invoice less provisional cash received gives the final cash due.
On the shipped case 1,648 dry tonnes yield 371.1 tonnes of payable copper. The final invoice is 3,371,777 USD against a provisional invoice of 3,200,000 USD, an adjustment of 171,777 USD. With 90,000 USD of the provisional invoice still unpaid, final cash due is 261,777 USD. A sensitivity tests price and assay changes.
What every model includes
Live formulas, no hardcoded values
Outputs are driven by live formulas, so the workbook updates from its assumptions instead of relying on hardcoded results.
All assumptions in one tab
Inputs are clearly marked in the Assumptions tab and separated from calculations, making it clear what to change and what to leave intact.
Statements always balancing
For integrated-statement models, the balance sheet, cash flow, and supporting schedules tie through properly.
Distinct schedules for clarity
Debt, working capital, taxes, and cash flow can get messy quickly. We group calculations in clear schedules, not across disconnected tabs.
No hidden macros or external links
There are no unexplained external workbook links or macros to undermine auditability or portability.
Changes flow through the model
Update a key driver and see the impact carry through the forecast, financing, and return outputs. We never use hardcoded numbers in formulas.
What's inside the Commodity Provisional Pricing Settlement Calculator
- Contract pricing windows with inclusive start and end dates
- Final price as the average of valid fixings in each window
- Fixing completeness check before release
- Dry tonnes from wet tonnes less moisture
- Payable metal after assay deduction and payability
- Treatment, refining and freight charges
- Arsenic penalty with prorated increments
- Final invoice, provisional invoice and adjustment by lot



Formatted to IB standards
Named theme colors repaint the whole workbook in one click, on top of an investment-banking structure with clear input, output, and cross-sheet reference styling - brand-ready, institutional-grade, and fully auditable.
Created by ex-finance professionals
Hey, I’m Alex and I created Finamodel.
Over my years in the finance industry I kept building the same models over and over again. Same structure, same assumptions, different logo. So I started building frameworks to turn them into clean, reusable templates.
Every model here is one I’d actually use for a client, and I personally vet each one before it goes up.
I’m not an expert in every industry, but I’ve built enough models to know what belongs in one. And when something is completely foreign to me, I reach out to my network for experts to work on our models with us.
Having a template library on hand cuts a first build from hours to minutes.
Frequently asked
What is provisional pricing?+
In many physical commodity contracts, the seller invoices at a provisional price on shipment. The final price is set later from market fixings over an agreed window, and a final invoice settles the difference.
How is payable metal calculated?+
Wet tonnes less moisture give dry tonnes. The copper assay is reduced by one percentage point, and payability of 96.5% applies to the remaining metal content.
Why are the final adjustment and cash due different?+
The final adjustment is final invoice less provisional invoice. Cash due also adds any part of the provisional invoice that is still unpaid.
What is not included?+
The workbook does not cover hedging, exchange margin or publication holidays. The contract terms are fictional and should be replaced with your own.
Can I use it for other metals?+
Yes, if the contract follows the same pattern. Change the pricing windows, assay deduction, payability, charges and penalties on Contract terms.
Have more financial modelling questions? Contact us
Related templates
Commodities Trading Model
Track commodity positions, hedges, and P&L with mark-to-market and exposure metrics.
Commodity Hedging Model
Structure and monitor hedges for commodity price exposure with effectiveness metrics.
Mining Operations Model
Financial model for mining projects including ore reserves, production costs, commodity pricing, and NPV analysis.
Food Manufacturing Model
Operating model for food production and processing businesses with ingredient sourcing, production scheduling, and margin analysis.
















